SGL Reading G-3 Tender Conversion

Machining the two new bolsters which have been soldered together

Machining the two new bolsters which have been soldered together

I was able to line up a trade of some surplus PRR equipment for a SGL Reading G3 Pacific. These models came out in 2002. They are nice models but rather lightly detailed. The Reading Modeler dose not have a lot of choices in mass produced steam locomotive models like some other roads have.

I had earlier taken apart the tender trucks to check out their design. It used a flat brass stamping as the bolster attached by screws into cast brass truck side frames. I test fit a set of Protocraft 36 inch wheel sets into the side frames to see if the axle ends would fit into the journal tubes on the side frames. They fit nicely into the side frame but not while the stock bolsters were in place. I measured the distance between the side frames without a bolster in place to get the length of the new bolsters that had to be made.

I purchased some K&S stock at my LHS which was just about the correct width and the same thickness of the old bolster.

I started by cutting two pieces of brass from the stock a little longer than the old bolsters. I soldered them together so that they could be machined at the same time. I placed the two pieces now soldered together into my milling vise. First I squared up the sides and ends. Then I machined them to the correct width. I marked the location of the holes based on the old bolster locations. The holes were drilled and tapped for 2-56 screws.

After the conversion, the old bolster and one O scale wheelsets in front of the two trucks.

After the conversion, the old bolster and one O scale wheelsets in front of the two trucks.

Here we see the trucks reassembled. As I first stated these are a basic design. If a similar truck is ever produced in Proto48, I would love to an upgrade these trucks. Until then these will do.

Here is the Tender for the G3 after the conversion

Here is the Tender for the G3 after the conversion

The reassembled trucks were placed back under the tender using the original screws. Not that bad looking after they are placed under the tender. All in all not too rough to convert, next comes the locomotive.